Seu navegador não suporta javascript!

Programa de Parcerias de InvestimentosPPI

CPRM's Mineral Project - Kaolin - Rio Capim/PA

CPRM's Mineral Project - Kaolin - Rio Capim/PA 

Home > Projects > CPRM's Mineral Project - Kaolin - Rio Capim/PA

Project's progress

Studies

Public Consultation

TCU Assessment

Bidding Documents

Auction

Contract

  • Completed
  • In progress
  • To be performed

Newsletter

Register your email to receive information about the projects of (Mining)

  • CLASSIFICATION BY MEETING

    10th Meeting

  • SECTOR

    Mining

  • ASSET

    Greenfield Project

  • PROJECT STATUS

    In progress

  • TYPE OF PARTNERSHIP

    Exploratory Concession Right

  • UF

    PA

  • CAPACITY

    792 million tons of inferred resource (520 million tons of kaolin, at a recovery rate of 65%).

  • MAJOR AGENCIES INVOLVED

    Ministry of Mines and Energy (MME), Brazilian Geological Survey (CPRM)

  • TERM (YEARS)

    To be defined

  • MINIMUM GRANT FEE

    To be defined

Project Summary


The Rio Capim Kaolin Project corresponds to a large kaolin deposit covering a total area of ​​10,000 hectares (ANM files nºs 812.869/1971 to 812.878/1971), divided into two blocks (Southern and Northern). Basic infrastructure is available on site and the deposit is close to another kaolin project.
 
Brightness and yield index values ​​were estimated for two types of ore: soft kaolin (low content of sand) and sandy kaolin. In the North Block, it has been estimated 574 million tonnes of ore (stripping ratio of 1: 1). In the Southern Block, the total resources have been estimated in 218 million tons (stripping ratio of 0.9). The sum of resources reached 792 million tons, with an average brightness index of 80%. At a recovery rate of 65%, the total resources are equivalent to 520 million tons.
  • Project Current Situation

    In study.

Other projects

  • MAC10 - liquid bulk terminal at the port of Maceió / AL

    Veja Projeto
  • STS 20 - Solid Bulk Terminal in the Port of Santos, São Paulo

    Veja Projeto