Project's progress

Studies

Public Consultation

TCU Assessment

Bidding Documents

Auction

Contract

02/14/2020
07/01/2020
12/08/2020
12/18/2020
04/07/2021
3rd quarter 2021
  • Completed
  • In progress
  • To be performed
  • CLASSIFICATION BY MEETING

    9th Meeting

  • SECTOR

    Airport

  • ASSET

    Brownfield Project

  • PROJECT STATUS

    In progress

  • TYPE OF PARTNERSHIP

    Common Concession

  • TYPE OF INITIATIVE

    Privado (PMI)

  • UF

    AC,AM,GO,MA,PR,PE,PI,RS,RO,RR,SC,TO

  • DEMAND

    24,3 million passengers (2019)

  • BASE DATE

    02/2020

  • INVESTMENT CAPEX

    BRL 6,130,000,000.00

  • MAJOR AGENCIES INVOLVED

    ANAC and MINFRA

  • TERM (YEARS)

    30

  • MINIMUM GRANT FEE

    South Block: BRL 516,278,067.20 / Central Block: BRL 49,696,447.47 / North Block: BRL 43,736,988.96

  • BIDDERS

    Airport Operators and Financial Investors

Project Summary

The project refers to a concession with the aim of expanding, maintaining and operating 22 airports, distributed in 3 clusters – South, North I and Central.

The concessions program in the airport sector aims to provide investments with quality and celerity. The improvement in service delivery has been noticed since the first round of airport concessions in 2011, which has led to significant investments in the main airports of the Brazilian network, benefiting the entire air network and reducing flight delays and cancellations to better standards than international references.

From the management point of view, private management brings many benefits, since the airport sector is very dynamic and intensive in providing services, incorporating, permanently, new practices and technologies.

As potential stakeholders, there are players such as airport operators and financial investors. The basic premise is the requirement of investments compatible with the levels of established services, which should meet the needs of users over the term of the contract.

The bodies involved in the process of concession of the airports to the private sector are the National Civil Aviation Agency (ANAC), as the granting authority, and the Ministry of Infrastructure (MINFRA), as responsible for the elaboration of sectoral policy and for the conduction and approval of studies.
 

SOUTH CLUSTER

With investments for the 30-year concession initially estimated at BRL 2.9 billions*, the Southern Cluster moved in 2019 about 12.4 million passengers. The airports are:

- Curitiba International Airport - Afonso Pena, located in the Municipality of São José dos Pinhais, in the State of Paraná;

- Foz do Iguaçu International Airport - Cataratas, located in the Municipality of Foz do Iguaçu, in the State of Paraná;

- Navegantes International Airport - Minister Victor Konder, located in the Municipality of Navegantes, in the State of Santa Catarina;

- Londrina Airport - Governador José Richa, located in the Municipality of Londrina, in the State of Paraná;

- Joinville Airport - Lauro Carneiro de Loyola, located in the Municipality of Joinville, in the State of Santa Catarina;

- Bacacheri Airport, located in the Municipality of Curitiba, in the State of Paraná;

- Pelotas International Airport - João Simões Lopes Neto, located in the Municipality of Pelotas, in the State of Rio Grande do Sul;

- Uruguaiana International Airport - Rubem Berta, located in the Municipality of Uruguaiana, in the State of Rio Grande do Sul;

- Bagé International Airport - Commander Gustavo Kraemer, located in the Municipality of Bagé, in the State of Rio Grande do Sul.

 
NORTH CLUSTER I

With investments for 30 years of investment in the amount of BRL 1.6 billion*, the North Cluster in 2019 circulated about 4.6 million passengers. The airports are:

- International Airport of Manaus - Eduardo Gomes, located in the Municipality of Manaus, in the State of Amazonas;
 
- Porto Velho International Airport - Governador Jorge Teixeira de Oliveira, located in the Municipality of Porto Velho, in the State of Rondônia;
 
- Rio Branco - Plácido de Castro Airport, located in the Municipality of Rio Branco, in the State of Acre;
 
- Boa Vista International Airport - Brazil Cantanhede Atlas, located in the Municipality of Boa Vista, in the State of Roraima;
 
- Cruzeiro do Sul International Airport, located in the Municipality of Cruzeiro do Sul, in the State of Acre;
 
- Tabatinga International Airport, located in the Municipality of Tabatinga, in the State of Amazonas;
 
- Tefé Airport, located in the Municipality of Tefé, in the State of Amazonas.

 
CENTRAL CLUSTER

With investments for the 30-year concession initially estimated at BRL 2.1 billion*, the Central Cluster moved in about 7.3 million passengers in 2019. The airports are:
 
- Goiânia Airport - Santa Genoveva, located in the Municipality of Goiânia, in the State of Goiás;
 
- São Luís International Airport - Marechal Cunha Machado, located in the Municipality of São Luís, in the State of Maranhão;
 
- Teresina Airport - Senator Petrônio Portella, located in the Municipality of Teresina, in the State of Piauí;
 
- Palmas Airport - Brigadeiro Lysias Rodrigues, located in the Municipality of Palmas, in the State of Tocantins;
 
- Petrolina Airport - Senator Nilo Coelho, located in the Municipality of Petrolina, in the State of Pernambuco;
 
- Imperatriz Airport - Mayor Renato Moreira, located in the Municipality of Imperatriz, in the State of Maranhão.
 
These values were initially estimated in the technical, economic and environmental feasibility studies of each airport/block.

Gallery

6th Round of Airport Concessions

6th Round of Airport Concessions

Blocks South, North and Central

Files

  • 18 de fevereiro de 2020

    EVTEA Executive Summary - South Cluster

  • 18 de fevereiro de 2020

    EVTEA Executive Summary - Central Cluster

  • 18 de fevereiro de 2020

    EVTEA Executive Summary - North Cluster

  • 09 de março de 2021

    Bidding Documents

    LINK

Other projects

  • Support for environmental licensing of the implementation of the Transparent Well Project in a low permeability reservoir

    Veja Projeto
  • Concession of Anavilhanas National Park - AM

    Veja Projeto
Acesso à Informação
Governo do Brasil